After a Greenheck Fire Ready hood (model GRRB) discharges, the range stays locked out until the fire suppression system is serviced, recharged and re-armed, and Greenheck's GRRB manual (document 1074169) is clear about who does that: "All service on the fire suppression system after actuation should be performed by authorized equipment distributor." The recharge uses recharge kit 1075252, which the manual says supplies the agent, spring, O-ring and valve stem, and the after-actuation steps also replace the actuator from that kit. The facility's job is to make the hood safe, clean up, call an authorized fire equipment distributor and help get the right parts on site.
Why did the Fire Ready hood discharge?
The GRRB system watches two hood temperature sensors. The manual gives two trip points:
| Mode (1074169) | Temperature | What happens |
|---|---|---|
| High temp | 230°F | Fuel to the range is disconnected, the exhaust goes to high speed and the supply output turns on at high speed. The alarm sounds for 3 seconds, then chirps once per minute. A reset is required after temperatures drop. |
| Fire alarm | 250°F | The system discharges wet chemical, shuts off range fuel, ramps the exhaust to low speed and turns off the supply output. Pressing RESET mutes the alarm. |
The system can also be fired from the manual pull station. Whatever set it off, the manual's note on page 23 applies: "A complete system inspection and servicing must be done immediately following a kitchen range top fire."
Who is allowed to recharge and re-arm a Fire Ready hood?
Greenheck's manual does not leave this to the kitchen or to a general maintenance tech. In its own words:
- Cover page: "All service and maintenance on the fire suppression system should be conducted by an authorized fire equipment distributor."
- Cover page: "Do not tamper with fire suppression components if not instructed to do so."
- Page 20: "System arming is typically performed by factory authorized fire equipment distributor during startup."
- Page 20: "Do not tamper with the fire suppression system after the initial startup unless authorized to do so."
- Page 23: "Consult an authorized fire equipment company for service or proper procedure."
- Page 23: "All service on the fire suppression system after actuation should be performed by authorized equipment distributor."
The manual also says a fire "puff" test "may be necessary or required per local AHJ" (the Authority Having Jurisdiction) and that "This test should only be performed by factory authorized fire equipment distributor after startup." Check with your AHJ on any inspection they require before the kitchen reopens.
What can the facility do right after a discharge?
The first two after-actuation steps on page 23 are the ones a facility can act on while waiting for the distributor:
- Shut off power to the hood and the range disconnect. The manual's step 1: "Shut off power to hood and range disconnect."
- Clean up the agent. The manual's step 2: "Clean up all wet chemical using soap and warm water with a sponge. Do not use vacuum cleaner." The manual recommends approved eye protection and rubber gloves when handling the wet chemical and the tank.
- Call an authorized fire equipment distributor. Leave the cylinder, actuator, distribution assembly and control module alone until they arrive.
- Write down what happened. Note whether the system fired from heat or from the pull station, the hood model and serial number, and any chirps or lights on the control.
What will the distributor do?
So you know what to expect, and which parts need to be on site, here is the rest of the manual's after-actuation procedure in summary. It is the distributor's work, not a do-it-yourself procedure:
- Remove the battery from the fire suppression control board, disconnect the actuator from the U1 control module and take the extinguisher cylinder assembly out.
- Empty the cylinder and refill it with 4.9 lbs. of wet chemical agent from the recharge kit.
- Flush the distribution assembly with water and blow it dry.
- Replace the cylinder manifold O-ring, spring, valve stem and actuator with the recharge kit parts (the manual names PN 1075252).
- Pressurize the cylinder with nitrogen to 100 PSI, reinstall it and re-arm the system using the manual's "Arming the System" section.
Re-arming includes removing the tank's pull pin. The manual warns: "Without removing the pull pin, the system will never be able to expel wet chemical on the fire while in fire detect mode if a fire occurs." Confirm with the distributor that this step was completed. If the hood chirps afterwards, our article on Fire Ready chirp codes and sensor 1075242 explains what each code means.
Recharge kit or a new charged cylinder?
The parts list (page 31) offers both: recharge kit 1075252 ("with agent, spring, o-ring, and valve stem") and charged cylinder assembly 1075240. The maintenance table on page 28 says the extinguisher tank is inspected monthly, recertified annually and replaced every 10 years. Field practice, not from the manual: the distributor will usually decide between recharging the existing cylinder and fitting a charged one, based on the cylinder's condition and recertification date, so ask them which they need before ordering.
Parts that fix it
| Component | Role | Link |
|---|---|---|
| Recharge kit | Manual part 1075252: agent, spring, O-ring and valve stem, used by the distributor after actuation | Greenheck 1075252 Fire System, G800-RK, Recharge Kit |
| Charged cylinder assembly | Manual part 1075240, "Charged Cylinder Assembly" | Greenheck 1075240 Fire System, Assembly, G803-FRH, Charged Cylinder |
| Distribution assembly | Manual part 1075241: hose, nozzle and nozzle bracket (system requires 2), if the distributor finds one damaged | Greenheck 1075241 Fire System, Assembly, G804-FRH, Distrb |
| Test cylinder | Manual part 1075250, "must be charged with nitrogen in the field"; used for the puff test | Greenheck 1075250 Fire System, Tank, G814-FRH, Test |
| Fire Ready test tool | Manual part 1075251, used for the puff test | Greenheck 1075251 Fire System, Test Tool, G816-FRH |
Which units this applies to
- Greenheck model GRRB Fire Ready hoods covered by document 1074169.
- If your hood label shows a different model, use the manual for that model.
Scope: Trip temperatures, the after-actuation and arming summary, the 4.9 lb agent quantity, the 100 PSI charge, the maintenance intervals, the service statements and the part numbers come from Greenheck document 1074169, R2 (October 2026). Our listing titles use Greenheck's G8xx-FRH names; the part numbers match the manual's parts list.
Before you order
Ask your fire equipment distributor which parts they want on site, and note the hood model and serial number, whether the system fired from heat or the pull station, and the date on the cylinder. To confirm a part number, contact us or email help@totalhvacparts.com, or browse Valent, Innovent & Greenheck Replacement Parts.
Frequently Asked Questions
What do I do after a Greenheck Fire Ready hood discharges?
Shut off power to the hood and range disconnect, clean up the wet chemical with soap, warm water and a sponge (no vacuum), and call an authorized fire equipment distributor. Manual 1074169 says all service after actuation should be performed by an authorized equipment distributor.
Can our maintenance staff recharge the Fire Ready cylinder?
Greenheck's manual says no: all service and maintenance on the fire suppression system should be conducted by an authorized fire equipment distributor, and the system should not be tampered with unless authorized.
What is in the Fire Ready recharge kit 1075252?
The parts list describes it as agent, spring, O-ring and valve stem. The after-actuation steps also replace the actuator from the recharge kit, and the cylinder takes 4.9 lbs. of wet chemical agent.
At what temperature does a Fire Ready hood discharge?
At 250°F the system enters fire alarm mode and discharges. At 230°F it goes into high temp mode, shutting off fuel and running the fans at high speed without discharging.
Is an inspection required after a Fire Ready discharge?
Yes. The manual says a complete system inspection and servicing must be done immediately following a kitchen range top fire, and a puff test may be required by your local AHJ.
Sources
- Greenheck document 1074169, Model GRRB Fire Ready Hood, Installation, Operation and Maintenance Manual, R2, October 2026
- Live product titles for the parts listed above, as shown on each product page
Fire Ready hoods contain a pressurized wet chemical fire suppression system and control the range's fuel supply. Recharging, re-arming, testing and any other service on the suppression system must be left to an authorized fire equipment distributor, following Greenheck's manual, your Authority Having Jurisdiction and your facility's lockout/tagout procedures.